Powernet
Powernet
Powernet
New
Powernet
Powernet
Powernet

Powernet

Overview

POWERNET
YOUR ANSWER FOR BRIDGING PROBLEMS

  • Diameter for storage units from the top or bottom:
  • 65 to 300 mm
  • Intervention depth: Up to 45m
  • Controlled from outside
  • All types of storage units
  • All types of materials
  • To be used before GIRONET
  • 2 versions
    – Pneumatic: for friable products (coal, bran, sugar, ash etc.)
    – Hydraulic: for hard products(slag, cement, sulphate carbonate etc.)

Advantages

TOTAL SAFETY : No human presence inside the silos and hoppers/Our teams comply with safety standards

SAVINGS : Production continues while intervention/100% storage capacity regained/material loss

PERFORMANCE : Intervention above or under & on all types of materials/rapid & efficient intervention

ENVIRONMENT : Dry holing (no additives / Pollution free)

Related Services

  • Visits & recommendations
  • Assembly & cleaning by us
  • Rapid intervention
  • Intervention by our specialised teams
  • Cleaning finalised with GIRONET

Options / Accessories

DRILLS:

3 types of drills:

– Diameter 65 mm: pre-piercing
– Diameter 150 mm: Piercing
– Diameter 300 mm: Final piercing

Case Studies

CUSTOMER: One of the leaders in the chemical industry in Germany

PROBLEM: Bridging in a silo with a capacity of 9000 m3 (20 m high, 6m diameter). Approximately 15% of the material stored was clogged.

PRODUCT: Sodium carbonate

OBJECTIVE: To empty the silo in order to recover 100% of the storage capacity.

SOLUTION: – First step: Use of pneumatic POWERNET to create a chimney with a diameter of 350 mm.
– Second step: Intervention by pneumatic GIRONET and efficiently clean the whole of the silo

RESULT: The customer recovered all of its storage capacity. Production was not stopped and the intervention took place in complete safety and without human intervention inside the storage unit.


CUSTOMER: Sugar house in France

PROBLEM: Clogging by material of the 70 extractions of the silo. Loss of storage capacity: 1000 tonnes of material clogged in a 5000-tonne silo.

PRODUCT: Sugar

OBJECTIVE: Complete emptying of the silo

SOLUTION: – First step: Use of pneumatic POWERNET to evacuate the extractions
– Second step: Intervention by 2 pneumatic GIRONETs to evacuate the material

RESULT: Recovery of all of the storage capacity of the silonit.

Catalogues

Error product group when enable variant picker

Availability: In stock
Powernet

Powernet

$0.00

Powernet: overview and buying guide

The Powernet (model Powernet) is made by STANDARD INDUSTRIE INTERNATIONAL and listed in our environment · energy range. Premium Emart sources it directly from the manufacturer and handles the quotation, inspection, export packing and international shipping, so you can buy it from anywhere in the world with a single point of contact.

Frequently asked questions

How much does the Powernet cost?

Prices depend on the configuration, quantity and destination. Add the item to your RFQ list and we will send a free quotation with the unit price, lead time and shipping cost. There is no obligation to buy.

Can you ship the Powernet to my country?

Yes. We export worldwide by sea, air or courier, with export packing and the commercial invoice, packing list and certificate of origin where required. The shipping options are shown in your quotation.

Is this a genuine STANDARD INDUSTRIE INTERNATIONAL product?

We purchase directly from STANDARD INDUSTRIE INTERNATIONAL or its authorised channels and confirm the model and specifications with the manufacturer before ordering.

What is the minimum order quantity?

For most items the minimum order is one unit. If the manufacturer sets a higher minimum, we tell you in the quotation.

Overview

POWERNET
YOUR ANSWER FOR BRIDGING PROBLEMS

  • Diameter for storage units from the top or bottom:
  • 65 to 300 mm
  • Intervention depth: Up to 45m
  • Controlled from outside
  • All types of storage units
  • All types of materials
  • To be used before GIRONET
  • 2 versions
    – Pneumatic: for friable products (coal, bran, sugar, ash etc.)
    – Hydraulic: for hard products(slag, cement, sulphate carbonate etc.)

Advantages

TOTAL SAFETY : No human presence inside the silos and hoppers/Our teams comply with safety standards

SAVINGS : Production continues while intervention/100% storage capacity regained/material loss

PERFORMANCE : Intervention above or under & on all types of materials/rapid & efficient intervention

ENVIRONMENT : Dry holing (no additives / Pollution free)

Related Services

  • Visits & recommendations
  • Assembly & cleaning by us
  • Rapid intervention
  • Intervention by our specialised teams
  • Cleaning finalised with GIRONET

Options / Accessories

DRILLS:

3 types of drills:

– Diameter 65 mm: pre-piercing
– Diameter 150 mm: Piercing
– Diameter 300 mm: Final piercing

Case Studies

CUSTOMER: One of the leaders in the chemical industry in Germany

PROBLEM: Bridging in a silo with a capacity of 9000 m3 (20 m high, 6m diameter). Approximately 15% of the material stored was clogged.

PRODUCT: Sodium carbonate

OBJECTIVE: To empty the silo in order to recover 100% of the storage capacity.

SOLUTION: – First step: Use of pneumatic POWERNET to create a chimney with a diameter of 350 mm.
– Second step: Intervention by pneumatic GIRONET and efficiently clean the whole of the silo

RESULT: The customer recovered all of its storage capacity. Production was not stopped and the intervention took place in complete safety and without human intervention inside the storage unit.


CUSTOMER: Sugar house in France

PROBLEM: Clogging by material of the 70 extractions of the silo. Loss of storage capacity: 1000 tonnes of material clogged in a 5000-tonne silo.

PRODUCT: Sugar

OBJECTIVE: Complete emptying of the silo

SOLUTION: – First step: Use of pneumatic POWERNET to evacuate the extractions
– Second step: Intervention by 2 pneumatic GIRONETs to evacuate the material

RESULT: Recovery of all of the storage capacity of the silonit.

Catalogues