{"product_id":"jack-up-mount-system-140986","title":"Jack-up Mount System YBM-100","description":"\u003cp\u003e\u003cstrong\u003eProduct Composition\u003c\/strong\u003e\u003c\/p\u003e \u003cp\u003eBuilding air conditioning rooms, bowling alleys, gymnasiums\u003c\/p\u003e \u003cp\u003e\u003cstrong\u003eProduct Characteristics\u003c\/strong\u003e\u003c\/p\u003e \u003cul\u003e \u003cli\u003eThe jack-up system aims to block the transmission of noise, vibration, and impact sounds from vibration sources such as air conditioning rooms, machine rooms, and bowling alleys to lower floors and surrounding areas.\u003c\/li\u003e \u003cli\u003eThe existing SLAB acts as a sound insulation structure to increase noise transmission loss, while the mount prevents the transmission of internal vibrations and primary solid-borne sound.\u003c\/li\u003e \u003cli\u003eThere are two types: housing cast iron and engineering plastic. It has the advantage of having a built-in coil spring, allowing for a natural frequency of 4.5 Hz.\u003c\/li\u003e \u003c\/ul\u003e \u003cp\u003e\u003cstrong\u003eJack-Up Mount System YBM Product Detailed Sizes\u003c\/strong\u003e\u003c\/p\u003e \u003cp\u003e\u003cstrong\u003e\u003c\/strong\u003e\u003c\/p\u003e \u003cp\u003e\u003cstrong\u003eJack-Up Mount System YBM Before and After Lift\u003c\/strong\u003e\u003c\/p\u003e \u003cp\u003e\u003cstrong\u003e\u003c\/strong\u003e\u003c\/p\u003e \u003cp\u003e\u003cstrong\u003eJack-Up Mount System YBM Product Installation Method\u003c\/strong\u003e\u003c\/p\u003e \u003cp\u003e\u003cstrong\u003e\u003c\/strong\u003e\u003c\/p\u003e \u003cul\u003e \u003cli\u003e Maintain the level (1\/100) of the existing reinforced concrete slab.\u003c\/li\u003e \u003cli\u003eAttach perimeter isolation boards (Isopink: 170mmH x 20mmTHK) to separate from walls or concrete curbs.\u003c\/li\u003e \u003cli\u003eLay two layers of 0.4t thick vinyl. (The connection between vinyl sheets should be finished with waterproof adhesive tape).\u003c\/li\u003e \u003cli\u003eMark the installation position of the YBM jack-up mount with a chalk line according to the design drawing, then install the YBM jack-up mount.\u003c\/li\u003e \u003cli\u003ePour 100mm thick concrete. (Curing period: 15 days or more).\u003c\/li\u003e \u003cli\u003eRemove the rubber cap from the top of the YBM jack-up mount, then insert the screw bolt.\u003c\/li\u003e \u003cli\u003eInsert the jack-up driver into the screw bolt, turn it 23 turns clockwise, then turn it 1\/2 turn counter-clockwise to relieve the stress on the YBM jack-up mount. After re-checking the level of the worked slab, a 50mm air gap will have formed.\u003c\/li\u003e \u003cli\u003eAfter the jacked-up floor is finished, properly seal the perimeter isolation boards and vinyl, then caulk with 10mm thick sealant.\u003c\/li\u003e \u003cli\u003eSealant caulking is applied to the top of the jack-up mount to prevent dirt and moisture ingress. If the top of the jacked-up floor needs to maintain a uniform surface (e.g., bowling alley rails), a mortar finish is applied.\u003c\/li\u003e \u003c\/ul\u003e\u003cp\u003e\u003cem\u003eDetailed specification sheets are shown in the product images.\u003c\/em\u003e\u003c\/p\u003e","brand":"YJ Industry","offers":[{"title":"Default Title","offer_id":58446804418900,"sku":null,"price":0.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1098\/4649\/5572\/files\/37684985-d1d3-47dd-980e-182b5a66cdf9.jpg?v=1795191795","url":"https:\/\/premiumemart.com\/products\/jack-up-mount-system-140986","provider":"Premium Emart","version":"1.0","type":"link"}