Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
New
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink
Isopink

Isopink

Overview

Insulation system with the quality never can be emulated

Introduction

Byucksan where takes a part in energy saving through supplying Korea’s best quality organic insulation system uses the high-end Hydrovac TM Process, which is the world’s first patented technology, and produce/supply the vacuum extruded and expanded polystyrene insulation system Isopink. Now, Byucksan will put more efforts for providing the best service to customers along with the reputation established from the quality.

Certificates

Application

Insulation of inner/outer wall and rooftop of buildings i.e. apartment, officetel(Multi-purpose building, office + hotel), etc.

Floors of sports centers i.e. ice link, etc.

Cold storage, insulation of freezing and cooling truck Insulation, heating of pigsty, etc.

Features

Type

Product Thickness 10 15 20~45 50~75 80 85 90 95 100 105 110 115 120 125 130 140 145 150 155~250
Special Type
Type 1
Type 2
Type 3
Thickness Tolerance +2, -1 ±2 ±3 Followed by agreement
Width Special Type, Type 1 900 1000
Type 2, Type 3 900 -
Length Special Type, Type 1, Type 2, Type 3 1800 ~ 2900 (in 10mm)
Length, Width Tolerance Length Less than1000 +10, -0 / Length 1000 or more +15, -0 / Length 2000 or more : +20,0
Width Less than 1000 +10, -0 / 1000 or more +15, -0

※ Ship-Lap maximum production size - 160T

※ Please contact the sales staff for laminated products with thickness of 180 or more.

※ Please contact the sales staff for the thickness exceeding the production standard.

Edge Type


Square
Ship-Lap

Properties

Item Insulation Plate Dampproof Plate
Special Type 1 Type 2 Type 3 Type 1 Type 2
Compressive Strength (N/㎠) 25 or higher 18 or higher 14 or higher 10 or higher 12 or higher 7 or higher
Bending Failure Load (N) 45 or higher 35 or higher Density (kg/㎥)
30 or higher 25 or higher
Thermal Conductivity
(Average Temp. 23±2℃)(W/m·K)
Initial thermal conductivity 0.027 or lower 0.028 or lower 0.029 or lower 0.031 or lower 0.031 or lower 0.033 or lower
Long-term thermal conductivity 0.029 or lower 0.030 or lower 0.031 or lower 0.033 or lower
(Ref.) Vapor Permeance
(per thickness of 25mm (ng/m2•s•Pa)
146 or lower -
Combustibility Must have combustion time within 120 seconds and the combustion length of 60mm or shorter.

※ Remarks : KS M 3808 standard (Initial thermal conductivity value is applied by quality management standard, long-term thermal conductivity value is applied by energy saving design standard of building.)

Construction Method

Hollow Wall (Double Hollow Wall) Piling Method

(1) Pile up inner wall. At this time, bury each Isopink around 40 × 80㎝ by bending in U shape with #16 wire for fixation.

(2) Install Isopink by fixing to already buried fixation wire.

(3) Make sure to have no flexure, and gap in between.

(4) Seal the joint between Isopink with dampproof tape.

(5) Fill the gap with Isopink pieces thoroughly, then seal with tape.

(6) Pile up outer wall by fixing with buried wire.


Bond Method (Complex Insulation Plate)

(1) Laminate Isopink and gypsum board 9.5mm with Isopink Bond 1, and produce laminated panel.

(2) Remove stain or dust on the wall to attach panel.

(3) Cut panel to fit to height of wall.

(4) Attach Isopink Bond 2 in 300mm space with diameter of 50mm, thickness of 3~5mm.

(5) Attach panel to make it horizontal. At this time, screw and fix concrete nail to support until Bond is completely hardened.

(6) Finish the joints with gypsum bond.


Exterior Wall Dry Construction Method

(1) While placing wall concrete, bury wire anchor to fix Isopink and finishing panel to outer surface.

(2) Hang Isopink to anchor. At the time, make sure to have no flexure, especially, close adherence of joint between Isopink.

(3) Hang finishing materials i.e. PC panel or marble panel to anchor to fix.


Rooftop Insulation Method

(1) Spread Isopink to stick to slab surface after drying ceiling slab surface.

(2) At this time, make sure not to have gap between Isopink.

(3) Spread humidity resistance tape in gaps.

(4) Spread dampproof layer tightly.

(5) Construct dampproof layer.

(6) Spread topping concrete in a certain thickness.

(7) Process finishing.

* Please inquire for details of cooling storage construction method and ice link floor construction method.

Detailed specification sheets are shown in the product images.

Catalogues

Error product group when enable variant picker

Availability: In stock
Isopink

Isopink

$0.00

Isopink: overview and buying guide

The Isopink is made by BYUCKSAN and listed in our construction · woodworking range. Premium Emart sources it directly from the manufacturer and handles the quotation, inspection, export packing and international shipping, so you can buy it from anywhere in the world with a single point of contact.

Frequently asked questions

How much does the Isopink cost?

Prices depend on the configuration, quantity and destination. Add the item to your RFQ list and we will send a free quotation with the unit price, lead time and shipping cost. There is no obligation to buy.

Can you ship the Isopink to my country?

Yes. We export worldwide by sea, air or courier, with export packing and the commercial invoice, packing list and certificate of origin where required. The shipping options are shown in your quotation.

Is this a genuine BYUCKSAN product?

We purchase directly from BYUCKSAN or its authorised channels and confirm the model and specifications with the manufacturer before ordering.

What is the minimum order quantity?

For most items the minimum order is one unit. If the manufacturer sets a higher minimum, we tell you in the quotation.

Overview

Insulation system with the quality never can be emulated

Introduction

Byucksan where takes a part in energy saving through supplying Korea’s best quality organic insulation system uses the high-end Hydrovac TM Process, which is the world’s first patented technology, and produce/supply the vacuum extruded and expanded polystyrene insulation system Isopink. Now, Byucksan will put more efforts for providing the best service to customers along with the reputation established from the quality.

Certificates

Application

Insulation of inner/outer wall and rooftop of buildings i.e. apartment, officetel(Multi-purpose building, office + hotel), etc.

Floors of sports centers i.e. ice link, etc.

Cold storage, insulation of freezing and cooling truck Insulation, heating of pigsty, etc.

Features

Type

Product Thickness 10 15 20~45 50~75 80 85 90 95 100 105 110 115 120 125 130 140 145 150 155~250
Special Type
Type 1
Type 2
Type 3
Thickness Tolerance +2, -1 ±2 ±3 Followed by agreement
Width Special Type, Type 1 900 1000
Type 2, Type 3 900 -
Length Special Type, Type 1, Type 2, Type 3 1800 ~ 2900 (in 10mm)
Length, Width Tolerance Length Less than1000 +10, -0 / Length 1000 or more +15, -0 / Length 2000 or more : +20,0
Width Less than 1000 +10, -0 / 1000 or more +15, -0

※ Ship-Lap maximum production size - 160T

※ Please contact the sales staff for laminated products with thickness of 180 or more.

※ Please contact the sales staff for the thickness exceeding the production standard.

Edge Type


Square
Ship-Lap

Properties

Item Insulation Plate Dampproof Plate
Special Type 1 Type 2 Type 3 Type 1 Type 2
Compressive Strength (N/㎠) 25 or higher 18 or higher 14 or higher 10 or higher 12 or higher 7 or higher
Bending Failure Load (N) 45 or higher 35 or higher Density (kg/㎥)
30 or higher 25 or higher
Thermal Conductivity
(Average Temp. 23±2℃)(W/m·K)
Initial thermal conductivity 0.027 or lower 0.028 or lower 0.029 or lower 0.031 or lower 0.031 or lower 0.033 or lower
Long-term thermal conductivity 0.029 or lower 0.030 or lower 0.031 or lower 0.033 or lower
(Ref.) Vapor Permeance
(per thickness of 25mm (ng/m2•s•Pa)
146 or lower -
Combustibility Must have combustion time within 120 seconds and the combustion length of 60mm or shorter.

※ Remarks : KS M 3808 standard (Initial thermal conductivity value is applied by quality management standard, long-term thermal conductivity value is applied by energy saving design standard of building.)

Construction Method

Hollow Wall (Double Hollow Wall) Piling Method

(1) Pile up inner wall. At this time, bury each Isopink around 40 × 80㎝ by bending in U shape with #16 wire for fixation.

(2) Install Isopink by fixing to already buried fixation wire.

(3) Make sure to have no flexure, and gap in between.

(4) Seal the joint between Isopink with dampproof tape.

(5) Fill the gap with Isopink pieces thoroughly, then seal with tape.

(6) Pile up outer wall by fixing with buried wire.


Bond Method (Complex Insulation Plate)

(1) Laminate Isopink and gypsum board 9.5mm with Isopink Bond 1, and produce laminated panel.

(2) Remove stain or dust on the wall to attach panel.

(3) Cut panel to fit to height of wall.

(4) Attach Isopink Bond 2 in 300mm space with diameter of 50mm, thickness of 3~5mm.

(5) Attach panel to make it horizontal. At this time, screw and fix concrete nail to support until Bond is completely hardened.

(6) Finish the joints with gypsum bond.


Exterior Wall Dry Construction Method

(1) While placing wall concrete, bury wire anchor to fix Isopink and finishing panel to outer surface.

(2) Hang Isopink to anchor. At the time, make sure to have no flexure, especially, close adherence of joint between Isopink.

(3) Hang finishing materials i.e. PC panel or marble panel to anchor to fix.


Rooftop Insulation Method

(1) Spread Isopink to stick to slab surface after drying ceiling slab surface.

(2) At this time, make sure not to have gap between Isopink.

(3) Spread humidity resistance tape in gaps.

(4) Spread dampproof layer tightly.

(5) Construct dampproof layer.

(6) Spread topping concrete in a certain thickness.

(7) Process finishing.

* Please inquire for details of cooling storage construction method and ice link floor construction method.

Detailed specification sheets are shown in the product images.

Catalogues